Monday, June 13, 2022

Work on the Man Cave

 We have a second driveway into our very large outbuilding, fondly known as

the Man Cave, or just simply the Cave.

We had the drive widened over the culvert area and it was very

interesting to watch!



More gravel was added.....



The backhoe put back the very large boulders, but Isaac and Joshua
helped relocate the smaller rocks to fill in.


Then, several weeks later, we finally had the outbuilding painted to match

the house!  It was a horrible shade of "smashed peas" color, and it now looks

so much better!  YEAH!!




This looks so much better!

No comments:

Post a Comment